Home
Download PDF
Order CD-ROM
Order in Print
Chapter 1-Blueprints
Figure 1-1.Blueprint title blocks.
Figure 1-2.Electrical plan.
Reference Number
Figure 1-3.Aircraft stations and frames
Bill of Material
Figure 1-6.Use of standard lines.
Shipboard Blueprints
Blueprint Numbering Plan
Filing and Handling Blueprints
Chapter 2- Technical Sketching
Figure 2-4.The triangles
Drawing Aids - 14040_25
Figure 2-7.Types of lines
Figure 2-7.Types of linesContinued.
Figure 2-8.Hidden-line technique.
Phantom Lines
Basic Computer Aided Drafting (CAD)
The Digitizer
Computer-Aided Design/Computer-Aided Manufacturing
Figure 2-20.Direct numerical control station.
Figure 2.21-Direct numerical Controller
Computer-Aided Design/Computer-Aided Manufacturing Cont.
Chapter 3-Projections and Views
Orthographic and Oblique Projection
Isometric Projection
Figure 3-10.Compare the orthographic views with the model
Perspective Drawings
Section Views - 14040_42
Half Section
Detail Drawings
Figure 3-25.Detailed drawing of a clevis.
Figure 3-27.Isometric drawing of a base pivot.
Figure 3-28.Detail drawing of a base pivot.
Chapter 4-Machine Drawing
Screw Threads
Figure 4-9.Schematic method of thread representation.
Figure 4-13.Screw thread terminology.
Gears
Finish Marks - 14040_54
Standards
Chapter 5-Piping Systems
Figure 5-4.Double-line pictorial piping drawing.
Fittings - 14040_59
Figure 5-9.Symbols used in engineering plans and diagrams.
Figure 5-9.Symbols used in engineering plans and diagramContinued.
Figure 5-10.Pipe line symbols.
Figure 5-11.Aircraft fluid line color code and symbols.
Shipboard Piping Prints - 14040_64
Figure 5-13.A section of an auxiliary steam system piping diagram.
Figure 5-14.Shipboard refrigerant circulating air-conditioning system.
Figure 5-15.Shipboard forced-lubrication system.
Figure 5-16.Basic types of hydraulic symbols.
Figure 5-17.Aircraft power brake control valve system.
Figure 5-18.Fluid power symbols.
Figure 5-19.Common plumbing symbols.
Figure 5-20.Pictorial view of a typical bathroom.
Figure 5-23.How to read fittings.
Chapter 6-Electrical and Electronics Prints
Cable Marking
New Cable Tag System
Isometric Wiring Diagram
Block Diagram
Figure 6-3.Steering system block diagram.
Schematic Diagram
Aircraft Electrical Prints - 14040_82
Figure 6-6.Electrical power distribution in P-3A aircraft.
Aircraft Wire Identification Coding
Shipboard Electronics Prints
Schematic Diagrams
Figure 6.11-Coder Indicator. Detail block diagram.
Figure 6.12-Section of radio receiver R-390A/URR. functional block diagram
Figure 6.13-Section of coder indicator. detailed schematic diagram.
Figure 6-14.Sample wiring diagram.
Block Numbering System
Interconnection diagrams
Figure 6.18- Sample Interconnection diagram
Aircraft Electronics Prints
Wiring Diagrams
Computer Logic
Figure 6-23.Logic operations comparison chart.
Basic Logic Diagrams
Figure 6.25- Sample detailed logic diagram
Detailed Logic Diagram Cont.
14040_102
14040_103
14040_104
14040_105
Chapter 7 - Structural and Architectural Drawings
Figure 7.1- Symbols for single structural shapes
Figure 7-2.Projecting structural shapes.
WELDED AND RIVETED STEEL STRUCTURES The following paragraphs will discuss welded and riveted steel structures and will give examples of both methods used to make trusses. WELDED STEEL STRUCTURES Generally, welded connections are framed or seated just as they are in riveted connections, which we will discuss later. However, welded connections are more flexible. The holes used to bolt or pin pieces together during welding are usually drilled in the fabrication shop. Beams are not usually welded direcWelded and riveted steel structures
Figure 7-3.Standard location of elements and types of welding symbols.
Figure 7-5.Application of welding symbols.
Figure 7-6.Welded steel truss.
Figure 7-7.Riveted steel truss.
Figure 7-8.Riveting symbols.
Construction Plans
Figure 7-9.Foundation plan
Figure 7-11.Floor plan.
Figure 7-12.Floor framing plan.
Section Views - 14040_120
Figure 7-15.- Wall Section
Specifications
Figure 7-16.Door, window, and eave details.
Figure 7-17.Architectural symbols.
Figure 7-18.Flow Chart for selection and documentation of concrete proportions.
Chapter 8- Developments amd Intersections
Figure 8-1.Joints, seams, and edges
Figure 8-2.Methods used to identify fold or bend lines
Sheet Metal Sizes
Straight-Line Development
Figure 8-9.Development of a right pyramid with true length-of-edge lines shown.
Right Pyramid
Figure 8-11.Development of a truncated pyramid.
Figure 8-12.Development of cylinders.
Figure 8-14.Development of a cone.
Radial-Line Development of Conical Surfaces
Figure 8-15.Development of a truncated cone
Development of Transition Pieces
Connecting Two Circular Pipes
Figure 8-19.Development of an offset transition piece
Oblique Joints
Appendix 1-Glossary - 14040_143
Appendix 1-Glossary Cont. - 14040_144
Appendix 1-Glossary Cont. - 14040_145
Appendix 1-Glossary Cont. - 14040_146
Appendix 1-Glossary Cont. - 14040_147
Appendix 2- Graphic Symbols for Aircraft Hydraulic and Pneumatic Systems
Appendix 2- Graphic Symbols for Aircraft Hydraulic and Pneumatic Systems Cont. - 14040_150
Appendix 2- Graphic Symbols for Aircraft Hydraulic and Pneumatic Systems Cont. - 14040_151
Appendix 2- Graphic Symbols for Aircraft Hydraulic and Pneumatic Systems Cont. - 14040_152
Appendix 2- Graphic Symbols for Aircraft Hydraulic and Pneumatic Systems Cont. - 14040_153
Appendix 2- Graphic Symbols for Aircraft Hydraulic and Pneumatic Systems Cont. - 14040_154
Appendix 2- Graphic Symbols for Aircraft Hydraulic and Pneumatic Systems Cont. - 14040_155
Appendix 3-Graphic Symbols for Electrical and Electronics Diagrams
Appendix 3-Graphic Symbols for Electrical and Electronics Diagrams Cont. - 14040_158
Appendix 3-Graphic Symbols for Electrical and Electronics Diagrams Cont. - 14040_159
Appendix 3-Graphic Symbols for Electrical and Electronics Diagrams Cont. - 14040_160
Appendix 4
Appendix 5-References Used to Develop The Traman
Appendix 5-References Used to Develop The Traman Cont.
Appendix 5-References Used to Develop The Traman Cont.
Assignment Questions - 14040_171
Assignment 1 - 14040_173
Assignment 1 Cont. - 14040_174
Assignment 1 Cont. - 14040_175
Assignment 1 Cont. - 14040_176
Assignment 1 Cont. - 14040_177
Assignment 1 Cont. - 14040_178
Assignment 1 Cont. - 14040_179
Assignment 2 - 14040_180
Assignment 2 Cont. - 14040_181
Assignment 2 Cont. - 14040_182
Assignment 2 Cont. - 14040_183
Assignment 2 Cont. - 14040_184
Assignment 2 Cont. - 14040_185
Assignment 2 Cont. - 14040_186
Assignment 3 - 14040_187
Assignment 3 Cont. - 14040_188
Assignment 3 Cont. - 14040_189
Assignment 3 Cont. - 14040_190
Assignment 3 Cont. - 14040_191
Assignment 3 Cont. - 14040_192
Assignment 3 Cont. - 14040_193
Assignment 4 - 14040_194
Assignment 4 Cont. - 14040_195
Assignment 4 Cont. - 14040_196
Assignment 4 Cont. - 14040_197
Assignment 4 Cont. - 14040_198
Assignment 4 Cont. - 14040_199